Agenda item

Planning Application CR/2022/0055/FUL - Phase 2, Steers Lane, Forge Wood, Crawley

To consider report PES/412bof the Head of Economy and Planning.

 

RECOMMENDATION to PERMIT.

 

Minutes:

The Committee considered report PES/412b of the Head of Economy and Planning which proposed as follows:

 

Erection of 60 dwellings including associated parking, landscaping and infrastructure works (amended plans and documents received).

 

Councillors Ali, Burrett, Jaggard and Mwagale declared they had visited the site.

 

The Principal Planning Officer provided a verbal summation of the application, which sought permission for a development of 40 one and two bedroom flats and 20 three and four bedroom houses with associated infrastructure.  In terms of the affordable units, of the 60 dwellings proposed, 24 were affordable and therefore the level of provision complied with the 40% criteria.

 

The Committee was informed that several corrections and clarifications to report PES/412b were required as follows:

·         The sixth line of paragraph 5.58 should read ’15 – 16m’.

·         The eight line of paragraph 5.58 was to be corrected to read ‘with balconies facing west’.

·         The sixth line of paragraph 5.64 was to be amended and should read ‘stores for theflats are also shown.

·         The figure of £18,047 to be added to the Air Quality Mitigation contribution amount within paragraph 5.95.

 

The Officer then drew the Committee’s attention to the first pages of the report which identified the plans and drawings which had been considered as part of the application.  The Committee was advised that amendments to the following drawing references were required:

 

Drawing Number

Revision

Drawing Title

072010-BEL-SL-01

C

Presentation Planning Layout

072010-BEL-SL-02

C

Supporting Planning Layout

072010-BEL-SL- PER03

 

Illustrative Perspective View 03

072012-BEL-SL-SS03

Street Scene 03

BU-4B-2S-P1

The Butler - Ground Floor & First Floor Plans

BU-4B-2S-TF-E1

The Butler - Elevations

BU-4B-2S-TB-E1

The Butler - Elevations

072010-BS01

Bin Store 01 Floor Plans & Elevations

CR-4B-2S-CB-E1

The Cobbler - Elevations

CR-4B-2S-P1

The Cobbler - Ground Floor & First Floor Plans

DE-3B-2S-CT-E1

The Dexter - Elevations

DE-3B-2S-P2

The Dexter - Ground Floor & First Floor Plans

DE-3B-2S-CW-E1

The Dexter - Elevations

DE-3B-2S-P1

The Dexter - Ground Floor & First Floor Plans

FI-3B-2S-CT-E1

The Fisher - Elevations

FI-3B-2S-CW-E1

The Fisher - Elevations

FI-3B-2S-P1

The Fisher - Ground Floor & First Floor Plans

MW-3B-2S-CB-E1

The Millwright - Elevations

MW-3B-2S-CB-E2

The Millwright - Elevations

MW-3B-2S-P1

The Millwright - Ground & First Floor Plans

PA-3B-2S-TB-E1

The Parkman - Elevations

PA-3B-2S-P1

The Parkman - Ground & FIrst Floor Plans

PL-3B-TB-E1

The Piper - Elevations

PL-3B-2S-P1

The Piper - Ground & First Floor Plans

072010-GAR01

Garden Room 01 - Floor Plans & Elevations

 

The Committee was then provided with details of the various relevant planning considerations as set out in the report.  Since the publication of the report, the CBC Refuse and Recycling Team had confirmed that house collections would be maintained at ‘front of residence’.  The Team had also requested that the bin store for Block 2 be enlarged and the Committee was informed that this was to be secured via condition.

 

The Officer informed the Committee that the Ecology Officer had requested several additional conditions, along with additions to the S106 clauses, in order to secure the various measures documented in the ecological report.  Those new conditions concerned:

·         Construction Environmental Management Plan

·         Biodiversity Enhancement Strategy

·         Wildlife Sensitive Lighting Design Scheme

·         Landscape and Ecological Management Plan – clause to be in the S106 Agreement.

 

In addition, the Bird Hazard Management Plan was no longer required and would be removed from the S106 Agreement.

 

As a result of the above and to provide clarification, Conditions 6, 7, 16 and 19 and Informative 3 had been amended, and new Conditions 27, 28 and 29 had been added.

 

Michael Birch, the applicant (Bellway Homes), then spoke in support of the application.  Matters raised included:

·         The proposed scheme’s mix of 1, 2, 3, and 4 bedroom houses and apartments included the provision of affordable homes to meet local needs.

·         Positive improvements had been made to the scheme, particularly regarding pedestrian connections with the site and access to green spaces.

·         The proposal was not constrained by water neutrality and therefore was capable of delivery.

 

The Committee then considered the application.  Committee members raised several queries, to which the officers provided the following clarifications:

·         The proposed cycle parking for the houses was provided within the garages or a storage shed in the rear gardens, whilst the flat blocks had integral cycle stores. The cycle storage provision was secured as part of the conditions. 

·         The development and operation of the drainage pumping station, plus the detail of its design, appearance, materials and boundary treatment were secured as part of Condition 8.

·         Concern was expressed over the location of the children’s play space and the type of facilities. The details of the play space including its location and equipment would be secured by the S106 Agreement. The Agreement also secured a financial contribution toward allotments, and the outdoor sports space provision.  These would not be provided at the site. 

·         Confirmation was provided as to the level of replacement tree planting that was achievable on site.  Whilst the precise detail, including the final confirmed number of specimens, would form part of the landscaping scheme required by condition and the Legal Agreement, it was acknowledged the mature trees would be maintained.

·         The current Forge Wood management company and any formation of an additional residential management company for this site was not a planning matter, but a matter for the developers.

·         Light pollution for Radford Road residents was a concern.  Whilst it was acknowledged there would be a change in the context for these existing properties, the trees along the northern boundary would be retained and enhanced with further planting/fencing and this was to be secured by the landscaping conditions.

·         A question was raised about the separation distances and potential for overlooking (with particular reference to Plot 4). Whilst the details of the balconies were already secured by condition, it was agreed that a new condition (Condition 30) be included to clarify the precise details. 

 

RESOLVED

 

Delegate the decision to the Head of Economy and Planning to conclude the Section 106 Legal Agreement and thereafter to permit the application subject to the conditions set out in report PES/412b (as amended), the following amended conditions, and additional conditions and informative.

 

 

Amended Conditions

 

6.         A.    No development above slab level shall take place unless and until a scheme that addresses the issues of acoustics, ventilation and thermal comfort (including overheating) has been submitted to and agreed in writing by the Local Planning Authority.

           

            For the purposes of this condition the scheme shall include:

           

            (i)    Identifying the level of noise exposure for each dwelling and the means by which the noise level within any (unoccupied) domestic living room or bedroom, with windows open for normal ventilation, shall not exceed 35 dB(A) Leq 16hr (between 07:00 and 23:00) and no more than 30 dB(A) Leq 8hr (between 23:00 and 07:00); and

           

            (ii)   The means by which the noise level within any (unoccupied) domestic bedroom, with windows open, shall not normally exceed 42 dB(A) LAFmax between 23:00 and 07:00.

           

            (iii)   The means by which a road traffic noise level in any external amenity area shall not normally exceed 50dB LAeq,16hr. Where this standard cannot be achieved despite all potential mitigation being carried out, a level of no more than 55dB LAeq,16hr will be acceptable for the whole or a proportion of the private amenity area, the details of which are to be agreed with the LPA.

           

            (iv)  Where the standards in (i) or (ii) or both cannot be achieved with windows open, the scheme must show how those standards will be met with windows closed and the means by which adequate ventilation and, where appropriate, cooling will be provided.

           

            (v)   As a result of the increase in façade insulation the resistance to the passage of airborne sound of the partitions between any attached dwellings shall be at least 50 DnT,w + Ctr dB unless otherwise agreed with the Local Planning Authority in writing.

           

            (vi)  In any design, good acoustic design shall be employed to prevent noise exposure. The hierarchy of good acoustic design shall be applied in descending order and may include any combination of the following:

           

                 separating by distance;

                 reducing noise at source or relocating the source;

                 incorporation of barriers to break noise transmission pathways;

                 using the site layout and design to reduce noise propagation across the

                   Site;

                 using orientation of the buildings to reduce noise exposure of noise

                   sensitive rooms;

                 using façade design eg façade barriers, balconies and winter gardens to

                   minimise exposure to noise;

                 reliance on the building envelope to mitigate noise to acceptable levels.

                  

            (vii) In designing to achieve reasonable thermal comfort and prevent overheating then regard shall be had to the cooling hierarchy:

           

                 minimise internal heat generation through energy efficient design;

                 reduce the amount of heat entering a building in summer through

            orientation, shading, albedo, fenestration, insulation and green roofs and walls;

                 design to enable passive ventilation (e.g. cross ventilation);

                 provide mechanical ventilation;

                 provide active cooling (ensuring they are the lowest carbon options).

                  

            B.    No dwelling hereby permitted shall be occupied until the approved scheme has been implemented in respect of that dwelling. 

           

            C.    The scheme for each dwelling must be implemented in full and maintained for the lifetime of the dwelling. Any amendments to the scheme or alterations to it must be agreed in writing with the Local Planning Authority in advance.

           

            D.    No development above slab level shall take place until a verification strategy is agreed, in writing, with the Local Planning Authority in respect of the above scheme.  After completion of the dwellings and prior to occupation, testing in accordance with the verification strategy shall be performed to demonstrate compliance with the requirements of the scheme. A written report of the findings, identifying the level of compliance shall be submitted to the Local Planning Authority within one month of the survey. No dwelling shall be occupied until such time as compliance has been achieved in full.

           

            E.    Any and all acoustic reports submitted in relation to the scheme shall include characterisation of uncertainty and shall demonstrate the adoption of good practice to minimise uncertainty.

            REASON: To safeguard the amenities of future residents in the proposed dwellings in accordance with Policies CH3 and ENV11 of the Crawley Borough Local Plan 2015-2030.

           

7.         Before any work for the implementation of this permission commences, (excluding site clearance and ground works), detailed plans and particulars of the land levels and the finished floor levels of the dwellings shall be submitted to and approved in writing by the Local Planning Authority, and the dwellings shall be constructed in accordance with the approved levels.

            REASON: To enable the Local Planning Authority to control the development in detail in the interests of amenity in accordance with Policy CH3 of the Crawley Borough Local Plan 2015-2030.

            REASON FOR PRE-COMMENCEMENT CONDITION: To ensure the development will be in accordance with the approved details.

 

16.       Prior to the occupation of the dwelling to which they relate, the following windows shall be glazed with obscured glass as shown on the approved plans:

                  

                   HOUSES

                   Plots 27 – 30 first floor rear elevation bedroom 2

                                              

            These windows shall thereafter be permanently maintained in accordance with the agreed details.

            REASON: To protect the amenities and privacy of future occupiers in accordance with Policy CH3 of the Crawley Borough Local Plan 2015 -2030

 

19.       No development above slab level  shall be carried out until there has been submitted to, and approved by, the Local Planning Authority a soft and hard landscaping scheme, including details of retained trees, boundary treatments, any earthworks, grassed areas and the species, number and spacing of trees and shrubs to be planted. All planting, seeding or turfing comprised in the approved details of soft landscaping shall be carried out in the first planting and seeding season following the occupation of the buildings or the completion of the development, whichever is the sooner, and any trees or plants which, within a period of five years from the completion of development die, are removed or become seriously damaged or diseased, shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. All hard landscaping comprised in the approved details of landscaping shall be carried out before the completion of the development or first occupation, whichever is the sooner.

            REASON: In the interests of the amenity and of the environment of the development, and to avoid endangering the safe movement of aircraft and the operation of Gatwick Airport through the attraction of birds and an increase in the bird hazard risk of the application site, in accordance with Policies CH3 and CH7 of the Crawley Borough Local Plan 2015 - 2030.

 

New Conditions

 

27.       Prior to the commencement of the development a Construction Environmental Management Plan for Biodiversity shall be submitted to and approved in writing by the Local Planning Authority, in line with the details contained within the Ecological Appraisal (Aspect Ecology Ltd, November 2022).

            The CEMP (Biodiversity) shall include the following.

a)    Risk assessment of potentially damaging construction activities.

b)    Identification of “biodiversity protection zones”.

c)    Practical measures (both physical measures and sensitive working practices) to avoid or reduce impacts during construction (may be provided as a set of method statements).

d)    The location and timing of sensitive works to avoid harm to biodiversity features.

e)    The times during construction when specialist ecologists need to be present on site to oversee works.

f)     Responsible persons and lines of communication.

g)    The role and responsibilities on site of an ecological clerk of works (ECoW) or similarly competent person.

h)    Use of protective fences, exclusion barriers and warning signs.

i)      Containment, control and removal of any Invasive non-native species present on site

            The approved CEMP shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority

            REASON: To conserve protected and Priority species and allow the Local Planning Authority to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 (as amended) and s40 of the NERC Act 2006 (Priority habitats & species).

            REASON FOR PRE-COMMENCEMENT CONDITION: The measures need to be agreed before commencement of development to avoid any adverse impacts on protected and priority species.

 

28.       Prior to any works above slab level a Biodiversity Enhancement Strategy for protected and priority species, prepared by a suitably qualified ecologist, shall be submitted to and approved in writing by the Local Planning Authority.

            The content of the Biodiversity Enhancement Strategy shall include the following:

a)    purpose and conservation objectives for the proposed enhancement measures;

b)  detailed designs or product descriptions to achieve stated objectives;

c)   locations, orientations and heights of proposed enhancement measures by appropriate maps and plans (where relevant);

d)  persons responsible for implementing the enhancement measures; and

e)  details of initial aftercare and long-term maintenance (where relevant).

            The works shall be implemented in accordance with the approved details shall be retained in that manner thereafter.

            REASON: To enhance protected and priority species and habitats and allow the Local Planning Authority to discharge its duties under the NPPF 2021 and s40 of the NERC Act 2006 (Priority habitats & species).

 

29.       Prior to occupation, a finalised lighting design strategy for biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The strategy shall:

a)      identify those areas/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites and resting places or along important routes used to access key areas of their territory, for example, for foraging; and

b)      show how and where external lighting will be installed (through provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent the above species using their territory or having access to their breeding sites and resting places.

            All external lighting shall be installed in accordance with the specifications and locations set out in the scheme and maintained thereafter in accordance with the scheme. Under no circumstances should any other external lighting be installed without prior consent from the Local Planning Authority.

            REASON: To allow the Local Planning Authority to discharge its duties under the Conservation of Habitats and Species Regulations 2017 (as amended), the Wildlife & Countryside Act 1981 (as amended) and s40 of the NERC Act 2006 (Priority habitats & species).

 

30.       No development above slab level for Plots 4 and 5 shall take place unless and until precise details of the balconies serving these dwellings have been submitted to  and agreed in writing by the Local Planning Authority. The details shall include the means to ensure the privacy of  the future occupiers of both dwellings including any overlooking of the rear garden of Plot 4. The development shall thereafter be implemented in accordance with approved details and thereafter retained.

REASON: To enable the Local Planning Authority to control the development in detail to ensure a satisfactory visual appearance and to safeguard the privacy and amenities  between future occupiers in accordance with Policy CH3 of the Crawley Borough Local Plan 2015 – 2030.

 

 

Amended Informative

 

3.         The water efficiency standard required under Condition 22 is the ‘optional requirement’ detailed in Building Regulations Part G Approved Document (AD) Building Regulations (2015), at Appendix A paragraph A1.

 

 

 

 

Supporting documents: